Job completed:
We were recently asked by a homeowner to visit their property and remove and then install some parquet flooring in their home.
Products used:
- Ardex NA
- Parquet wood flooring
- Latex
- F.Ball F77
- Rubble sacks
Completion:
The project took 7 days for our experienced team to finish.
We uplifted and disposed of the existing parquet wood flooring before installing new material. Using a spinning machine with rough copper disc, we prepared the sub-floor with 1no coat of DPM F.Ball F77. We also removed all adhesives and mastic around the stone feature.
In the lounge, lobby and hallway, we prepared the sub-floor with Ardex NA latex 3/4mm coating as stick down wood. Latex into 4mm ply was also applied to the doorways.