Hayes School, Bromley

Job completed:

Having been impressed with our previous work, Hayes School in Bromley asked us to fit flooring on the main walkway through their school.

Products used:

Completion:

The floor was prepared with F Balls P131 Primer then screed with stop gap 300. All existing latex was broken back to the original sub-floor base before the installation of the Polyflor. This floor took 2 weeks to prepare. All vinyl joints were welded to colour match.