Job completed:
Having been impressed with our previous work, Hayes School in Bromley asked us to fit flooring on the main walkway through their school.
Products used:
- We fitted the high quality Polyflor 2000 PUR to provide long lasting and durable protection. The client chose the colour sapphire to complement the rest of the facility.
Completion:
The floor was prepared with F Balls P131 Primer then screed with stop gap 300. All existing latex was broken back to the original sub-floor base before the installation of the Polyflor. This floor took 2 weeks to prepare. All vinyl joints were welded to colour match.