Chessington World of Adventures, Safari Hotel, Zebra Changing Rooms – Case Study
Back again to fit the Zebra changing room, our fitters uplifted and disposed of the existing floor and prepared it with Ardex NA and P141
Back again to fit the Zebra changing room, our fitters uplifted and disposed of the existing floor and prepared it with Ardex NA and P141
Here we supplied and fitted Altro Aquarius – Colour Walrus AQ2007 including cap and cove. Uplifted and disposed of the existing flooring ready for the
Christie’s Auction House – Case Study Area: Entrance Walkway & Lobby Uplift/Dispose of the existing carpet underlay and gripper ready for fitting. Then the
Here we fitted, Altro Aquarius colour Walrus along with Burmatex Academy Tiles in Gresham Grey and Anthracite Entrance Matting to the lobby. All floor preparation was completed prior to fitting the flooring to the newly built pavilion.
We were recently asked to install vinyl flooring in the cat ward of a veterinary…
We were recently asked to install entrance matting in the main office building a…
We were recently asked to lay 600 sqm of carpet tiles and 2 entrance mats on the…
We were recently asked to visit Ebbsfleet International Station and carry out th…