Kent Flooring

Real Wood Flooring Installation, Chislehurst

Job completed:

The new extension required installation of brand new wood flooring throughout.

Products used:

Completion:

The sub-floor required a DPM (damp proof membrane). A 3mm screed was then applied before the installation of the wood flooring. The oak flooring was stuck directly to sub-floor using an adhesive from Bona.

You might also enjoy

Schedule Showroom Visit

Appointment Only

Request a Quote