Real Wood Flooring Installation, Chislehurst

  • Home
  • Real Wood Flooring Installation, Chislehurst

Job completed:

The new extension required installation of brand new wood flooring throughout.

Products used:

Completion:

The sub-floor required a DPM (damp proof membrane). A 3mm screed was then applied before the installation of the wood flooring. The oak flooring was stuck directly to sub-floor using an adhesive from Bona.

Why Choose Kent Flooring UK Ltd?

For a free quotation or for more information on any of our products and services, get in touch.