Job completed:
We fitted brand new wood flooring at one of Harris & Hoole’s cafes in London.
Products used:
- To ensure a professional finish and appearance, we fitted top quality European solid 20mm oak unfinished wood flooring throughout the property, which was then sealed using two different types of stain/seal.
Completion:
Before the floor was laid, we applied a damp proof membrane to the floor as a test. This proved that the floor was damp. The product used was F. Ball’s F75. We also used an accelerator to make the product dry quicker and then the F. Ball Stopgap 300 was then applied on top. All work was carried out and completed during out of office hours.